Renewable energy communities (CER)

Indicative CER incentive calculator.

It estimates the order of magnitude of the benefit that GSE grants in one year on the energy shared from a PV plant up to 1 MW inside an Italian renewable energy community (CER): the premium tariff (TIP) and the valorisation contribution, net of the fee covering GSE costs.

It does not estimate revenue from selling the energy, the cost of the plant or taxes, and it does not project the result onto later years. The result is always a range, never a single figure.

Last reviewed: · Parameters checked on

At a glance

Rules applied
in force on 2 October 2026
Period
one year of operation
Plant
photovoltaic, up to 1 MW
Result
range rounded to €100
Sources
MASE, GSE, ARERA, JRC, GME

Calculator

Four inputs, one range.

Non-binding estimate

Indicative, non-binding estimate based on the rules in force on 2 October 2026 and on wide ranges. The actual benefit depends on shared energy metered hour by hour, market prices and GSE checks. It is neither an offer nor advice: GSE determines and pays the amounts.

Plant data

From 1 to 1,000 kW, a single plant.

It sets the PV correction and the yield range.

Shared energy, as a share of production

Part of the production consumed by the community members in the same hour. It depends on their hourly consumption: no public source gives a typical value, so you choose it, as a range.

Applications for the PNRR grant had to be filed by 30 November 2025. With a grant the premium tariff is reduced by the factor F and the destination threshold drops from 55% to 45%.

Indicative yearly estimate

Euro for one year of operation, with the rules in force on 2 October 2026.

Estimated net benefit

4,500 to 11,600 euro a year

Breakdown, euro per year
ItemMinimumMaximum
Premium tariff on shared energy4,00010,700
Valorisation contribution (ARERA)5001,000
Fee covering GSE costs, excluding VAT, deducted9595
Net benefit4,50011,600

Premium tariff, valorisation and net benefit are rounded to €100; the GSE fee is shown unrounded. The net benefit is computed on unrounded values.

Underlying quantities
ItemMinimumMaximum
Production (MWh/year)112137
Shared energy (MWh/year)4582
Premium tariff applied (€/MWh)90130
Yield area
North, 1,124 to 1,375 kWh/kW per year
Power class
up to 200 kW, fixed part €80/MWh
PV correction
+€10/MWh, northern regions
Factor F
0, no grant

55% shared-energy threshold

The upper end of the chosen share is above the threshold. Above the threshold, the part of the premium tariff on the excess must go to consumers other than businesses or to social purposes. The total is not reduced: its destination is bound. GSE checks the share once a year.

Assumptions

  1. 01A single PV plant, new or repowered, up to 1 MW, in a CER whose members all sit under the same primary substation.
  2. 02All production is injected into the grid. Shared energy is, hour by hour, the lower of the energy injected and the energy drawn by the members; the shared-energy share is its yearly total as a fraction of production.
  3. 03Yield by geographic area from PVGIS (JRC): the minimum with horizontal modules, the maximum at optimal tilt, 14% system losses. It is not the yield of your site: in the mountains or with poor orientation it can fall below the minimum.
  4. 04Variable part of the premium tariff between 0 and 40 €/MWh: 0 if the hourly zonal price is always at least 180 €/MWh, 40 if it is always at most 140 €/MWh. No price forecast.
  5. 05With a capital grant, F grows linearly up to 0.50 for a grant of 40%, as Decree 414/2023 provides "in the generality of cases". The exempt share is applied proportionally.
  6. 06Valorisation contribution with the ARERA transmission tariff for 2026. No multi-year total: prices and fees change every year.
  7. 07The plant receives no other operating incentive and no Superbonus, and is not under net metering (scambio sul posto): the premium tariff cannot be cumulated with the former, and the contributions on shared energy are an alternative to the latter.

Method

How it is calculated, step by step.

The calculator applies the public formulas of Decree 414/2023, of the GSE operating rules and of the ARERA TIAD. Every step has two ends: the minimum combines the low values, the maximum the high ones.

  1. 01

    Yearly production

    power (kW) × yield (kWh/kW) ÷ 1,000 = MWh/year

    The yield is the PVGIS range of the region's area: North, Centre, South or Islands.

  2. 02

    Shared energy

    production × shared-energy share = MWh/year

    The minimum uses the low end of the chosen share, the maximum the high end. With all members under the same primary substation, the self-consumed energy on which the valorisation is computed equals the shared energy.

  3. 03

    Premium tariff

    (fixed part + variable part + PV correction) × (1 − F) = €/MWh

    Fixed part: 80, 70 or 60 €/MWh by power (up to 200 kW, up to 600 kW, above). Variable part: max(0; 180 − hourly zonal price), capped at 40 €/MWh. PV correction: +10 €/MWh in the northern regions, +4 €/MWh in the central ones. GSE applies the formula hour by hour and the cap comes before the correction.

  4. 04

    Reduction for a capital grant

    F = 0.50 × intensity ÷ 0.40

    F is 0 without a grant and 0.50 with a grant equal to 40% of the investment. It does not apply to energy shared by natural persons, territorial bodies, religious bodies, third-sector and environmental-protection bodies.

  5. 05

    Valorisation contribution

    shared energy × 11.90 €/MWh = €/year

    The unit fee is the variable part of the transmission tariff for low-voltage users: 1.190 euro cents per kWh in 2026. ARERA updates it every year.

  6. 06

    Fee covering GSE costs

    €0 up to 3 kW; €15 up to 20 kW; €15 + €1 for every kW above 20; plus VAT

    Paid every year, per plant. GSE invoices it with VAT and offsets it against the incentives; the calculation deducts it net of VAT, which is an extra cost for those who cannot recover it.

  7. 07

    Net benefit

    premium tariff + valorisation − GSE fee = €/year

    The result is rounded to €100 and stays a range.

In the glossary: Premium tariff (TIP), Reduction factor F, Zonal price (Pz), Valorisation contribution (CACV), Shared energy, Primary substation.

Worked example

100 kW in Lombardy, shared energy 40 to 60% of production, no capital grant. It is the case the calculator opens with.

Premium tariff: (80 + 0 + 10) × (1 − 0) = 90 €/MWh at the minimum; (80 + 40 + 10) × (1 − 0) = 130 €/MWh at the maximum.

Minimum and maximum values at every step
ItemMinimumMaximum
Yield (kWh/kW per year)1,1241,375
Production (MWh/year)112.4137.5
Shared energy (MWh/year)45.082.5
Premium tariff (€/MWh)90130
Premium tariff on shared energy (€/year)4,04610,725
Valorisation contribution (€/year)535982
GSE fee, excluding VAT (€/year)9595
Net benefit (€/year)4,48611,611
Net benefit, rounded (€/year)4,50011,600

The variable part and 2025 prices

In 2025 the average GME PUN Index was 115.94 €/MWh, with hourly prices from 0 to 289 €/MWh. A yearly average below 140 €/MWh does not tell what the variable part is worth: GSE computes it on every hour of shared energy. This is why the calculator uses the whole range, from 0 to 40 €/MWh.

GME, Newsletter no. 199, January 2026, 2025 annual report, pp. 2-3. Document of 16 January 2026 · checked on 2 October 2026

Sources

Parameters and sources, with dates.

Every value was read on the primary source and checked on 2 October 2026. The links lead to the document used.

Premium tariff

Fixed part of the premium tariff
80 €/MWh up to 200 kW; 70 €/MWh above 200 and up to 600 kW; 60 €/MWh above 600 kW
MASE, Ministerial Decree 7 December 2023, no. 414 (CACER Decree), signed text published by MASE, Annex 1, para. 1, letters a), b), c) (p. 23 of the PDF). Document of 7 December 2023 · checked on 2 October 2026
Cap on fixed and variable part
120, 110 and 100 €/MWh for the same classes, before the correction
MASE, Ministerial Decree 7 December 2023, no. 414 (CACER Decree), signed text published by MASE, Annex 1, para. 1, letters a), b), c) (p. 23 of the PDF). Document of 7 December 2023 · checked on 2 October 2026
Variable part
max(0; 180 − Pz), where Pz is the hourly zonal price
MASE, Ministerial Decree 7 December 2023, no. 414 (CACER Decree), signed text published by MASE, Annex 1, para. 1 (p. 23 of the PDF). Document of 7 December 2023 · checked on 2 October 2026
Hourly formula applied by GSE
TIP_h = { min[CAP; TPbase + max(0; 180 − Pz)] + FCzonale } × (1 − F)
GSE, Operating rules for the widespread self-consumption service and the PNRR grant (Annex 1), para. 2.2.2.1.2 (p. 41 of the PDF). Document of 16 July 2025 · checked on 2 October 2026
PV correction
+10 €/MWh in the northern regions; +4 €/MWh in the central regions; none elsewhere
MASE, Ministerial Decree 7 December 2023, no. 414 (CACER Decree), signed text published by MASE, Annex 1, para. 2 (p. 23 of the PDF). Document of 7 December 2023 · checked on 2 October 2026

Capital grant

Reduction factor F
from 0 to 0.50, linear in the grant intensity
MASE, Ministerial Decree 7 December 2023, no. 414 (CACER Decree), signed text published by MASE, Annex 1, para. 3 (pp. 23-24 of the PDF). Document of 7 December 2023 · checked on 2 October 2026
Maximum cumulable grant intensity
40% of the investment
MASE, Ministerial Decree 7 December 2023, no. 414 (CACER Decree), signed text published by MASE, art. 6(1) (p. 16 of the PDF). Document of 7 December 2023 · checked on 2 October 2026
Energy exempt from the F reduction
natural persons, territorial bodies, religious bodies, third-sector and environmental-protection bodies
MASE, Ministerial Decree 16 May 2025, no. 127, amending Decree 414/2023, art. 1, letter f) (p. 6 of the PDF). Document of 16 May 2025 · checked on 2 October 2026
Reference investment cost, where the measure sets none (Appendix E)
1,500 €/kW up to 20 kW; 1,200 €/kW up to 200 kW; 1,100 €/kW up to 600 kW; 1,050 €/kW up to 1,000 kW
GSE, Operating rules for the widespread self-consumption service and the PNRR grant (Annex 1), para. 1.2.1.6 (p. 17 of the PDF) and Appendix E (p. 171 of the PDF). Document of 16 July 2025 · checked on 2 October 2026
PNRR grant, application deadline
30 November 2025
GSE, Web page "Configurazioni per l'autoconsumo diffuso" (widespread self-consumption). Web page · checked on 2 October 2026

Valorisation and fees

Valorisation unit fee (TRAS_E, low voltage)
11.90 €/MWh in 2026
ARERA, Resolution 573/2025/R/eel, Table 3 (TRAS components), TABELLE.xlsx file, row d) "Other low-voltage users", year 2026. Document of 23 December 2025 · checked on 2 October 2026
Valorisation contribution for CERs
self-consumed energy × unit fee
ARERA, TIAD, Annex A to Resolution 727/2022/R/eel, as amended by Resolution 15/2024/R/eel, art. 6, paras. 6.3(a) and 6.4 (pp. 14-15 of the PDF). Document of 27 December 2022, text updated with the resolution of 30 January 2024 · checked on 2 October 2026
Shared and self-consumed energy
every hour, the lower of injected and withdrawn energy; the part referred to points under the same primary substation is self-consumed
ARERA, TIAD, Annex A to Resolution 727/2022/R/eel, as amended by Resolution 15/2024/R/eel, art. 1(1), letters r) and t) (p. 5 of the PDF). Document of 27 December 2022, text updated with the resolution of 30 January 2024 · checked on 2 October 2026
Fee covering GSE costs
€0 up to 3 kW; €15 up to 20 kW; above, €15 plus €1 for every additional kW; per year, per plant, plus VAT
MASE, Ministerial Decree 15 March 2024, no. 106, fees covering GSE costs, Annex 1, letter a), and Annex 2, letter a). Document of 15 March 2024 · checked on 2 October 2026

Conditions and limits

Maximum power per plant
1,000 kW
MASE, Ministerial Decree 7 December 2023, no. 414 (CACER Decree), signed text published by MASE, art. 3(2)(a) (p. 14 of the PDF). Document of 7 December 2023 · checked on 2 October 2026
Plants above 1 MW
valorisation contribution only
GSE, Web page "Configurazioni per l'autoconsumo diffuso" (widespread self-consumption). Web page · checked on 2 October 2026
Destination threshold of the excess
55% of injected energy; 45% with a capital grant
MASE, Ministerial Decree 7 December 2023, no. 414 (CACER Decree), signed text published by MASE, art. 3(2)(g) and Annex 1, para. 4 (pp. 14 and 24 of the PDF). Document of 7 December 2023 · checked on 2 October 2026
Duration of the right to the tariff
20 years from commercial operation
MASE, Ministerial Decree 7 December 2023, no. 414 (CACER Decree), signed text published by MASE, art. 4(3) and 4(7) (pp. 14-15 of the PDF). Document of 7 December 2023 · checked on 2 October 2026
Period of application of the premium tariff
until the thirtieth day after 5 GW of incentivised power is reached, and in any case not after 31 December 2027
MASE, Ministerial Decree 7 December 2023, no. 414 (CACER Decree), signed text published by MASE, art. 1(2) (p. 11 of the PDF). Document of 7 December 2023 · checked on 2 October 2026
Cumulation
not cumulable with other operating incentives or with the Superbonus; alternative to net metering
GSE, Web page "Corrispettivi e tariffa" (fees and tariff). Web page · checked on 2 October 2026

Yield

The yield areas and the sample provincial capitals are Altheon's choice: North and Centre as in Decree 414/2023, South (Campania, Molise, Apulia, Basilicata, Calabria) and Islands (Sicily, Sardinia). The values are those returned by PVGIS.

Yield, North
1,124 to 1,375 kWh/kW per year
JRC, PVGIS, API v5.3, PVcalc service, Milan and Verona: minimum Milan with horizontal modules, maximum Verona at optimal tilt. PVGIS queries: minimum, maximum. PVGIS-SARAH3 database, 2005-2023 averages · checked on 2 October 2026
Yield, Centre
1,159 to 1,504 kWh/kW per year
JRC, PVGIS, API v5.3, PVcalc service, Florence and Rome: minimum Florence with horizontal modules, maximum Rome at optimal tilt. PVGIS queries: minimum, maximum. PVGIS-SARAH3 database, 2005-2023 averages · checked on 2 October 2026
Yield, South
1,269 to 1,535 kWh/kW per year
JRC, PVGIS, API v5.3, PVcalc service, Naples, Bari and Catanzaro: minimum Bari with horizontal modules, maximum Naples at optimal tilt. PVGIS queries: minimum, maximum. PVGIS-SARAH3 database, 2005-2023 averages · checked on 2 October 2026
Yield, Islands
1,344 to 1,587 kWh/kW per year
JRC, PVGIS, API v5.3, PVcalc service, Palermo and Cagliari: minimum Palermo with horizontal modules, maximum Cagliari at optimal tilt. PVGIS queries: minimum, maximum. PVGIS-SARAH3 database, 2005-2023 averages · checked on 2 October 2026

Market context, outside the calculation

Day-ahead market prices in 2025
average GME PUN Index 115.94 €/MWh; hourly prices from 0 to 289 €/MWh
GME, Newsletter no. 199, January 2026, 2025 annual report, pp. 2-3. Document of 16 January 2026 · checked on 2 October 2026

Limits

What stays out of the calculation.

  • A typical share of shared energy: no primary source gives one, which is why you choose it.
  • Revenue from selling the injected energy, to GSE under the dedicated withdrawal scheme or on the market: the energy stays with the producer and is a separate revenue (Decree 414/2023, art. 4(2)).
  • The costs of the plant and of its operation, financing, and the tax treatment of tariff and valorisation.
  • Module degradation, downtime and shading: the PVGIS range does not include them.
  • Conventional losses on injected energy: for widespread self-consumption, injected energy is measured net of the conventional loss coefficients of the ARERA TIS (TIAD, art. 1); their values are not modelled.
  • Future zonal prices: no forecast, the whole range of the variable part is used.
  • Since 1 October 2025 the day-ahead market has 15-minute prices (GME). How GSE derives the hourly zonal price of the tariff from them has not been verified; with the range from 0 to 40 €/MWh the estimate does not change.
  • The transmission tariff from 2027: ARERA has not published it yet.
  • The part of the tariff with a bound destination above the 55% threshold (45% with a grant): the calculator flags the threshold but does not split the amounts.
  • Plants above 1 MW and configurations other than a CER, such as groups of self-consumers and remote self-consumption: for groups the valorisation has further components (TIAD, art. 6).
  • Mandatory capacity: if the plant also serves to meet the obligation to integrate renewables in buildings, the premium tariff is due only on the capacity above the mandatory capacity, while the valorisation contribution covers the whole plant (GSE operating rules, para. 1.2.1.4). The calculator does not apply this reduction.
  • The capacity still available: the premium tariff applies until the thirtieth day after 5 GW of incentivised power is reached, and in any case not after 31 December 2027 (Decree 414/2023, art. 1(2)). The calculator does not check it.
  • Multi-year totals: the right to the tariff lasts 20 years from commercial operation (Decree 414/2023, art. 4), but prices and fees change every year. Multiplying the estimate by 20 does not give a reliable figure.